Pradžia >> Produktai >> Pusiau automatinė elektros transformatorių bandymo sistema>> Pusiau automatinė skirstomojo transformatoriaus bandymų sistema

Pusiau automatinė skirstomojo transformatoriaus bandymų sistema

Dry-type transformer

Tai pusiau automatinė elektros transformatorių bandymų sistema, integruota į 20 pėdų/40 pėdų konteinerį ir atitinkanti IEC/IEEE standartus, palaikanti visus gamyklinius bandymus nuo 36 kV/5000 kVA iki 34,5 kV/30 000 kVA alyvinio arba sauso tipo transformatorių; naudojant pusiau automatinį procesą ir didelio tikslumo matavimus, bandymai, skaičiavimai ir ataskaitos yra atliekami automatiniu būdu, taip pat pritaikyta efektyviems bandymams daugelyje scenarijų.

Produkto detalės

Test Questions:

🟦 DC Resistance Measurement

🟦 Turns Ratio Measurement

🟦 Insulation Resistance Measurement

🟦 No-Load Loss Test

🟦 Load Loss Test

🟦 Inductance Withstand Voltage Test

🟦 Power Frequency Withstand Voltage Test

🟦 Temperature Rise Test (Optional)

🟦 Partial Discharge Test (Optional)

This product integrates the distribution cabinet, variable frequency power supply, intermediate transformer, compensation capacitor, measurement system, and power frequency test transformer into a single integrated box.

The overall system design is suitable for the following voltage levels:

Three-phase/Single-phase Transformers

🟦 High Voltage: 36kV and below (36kV–4.16kV)

🟦 Low Voltage: 0.12–1.5kV

🟦 Impedance: 2–10%

🟦 Capacity: Oil-immersed and dry-type transformers, with voltage up to 5000kVA

🟦 Compliance Standards: IEC60076/IEEE C57.12.90-2021

Customized test transformers with special parameters are available

🟦 System measurement accuracy: Precision transformers with accuracy class 0.05/YOKOGAWA WT500 and above power analyzers

DC resistance and turns ratio are tested by one-time wiring using test vehicles. Data can be uploaded to the regular testing system. No-load, load, inductive withstand voltage, and power frequency withstand voltage tests are all manually wired according to the test procedure, while the computer program automatically completes the tests. After the tests are finished, the results are automatically calculated, and the factory test report is exported.